Here are some tips to.
Hanging dry wall on a concrete basement wall.
Want the block wall in your basement to have a more finished appearance.
If you see any use a hammer and center punch to drive the metal tie a inch into the wall.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Secure the drywall to the studs image 2.
One common technique is to cover the block wall with drywall.
I ve on many occasions had to install drywall on a concrete or cinder block wall but never in a basement.
Mist the metal tie hole with water and use a margin trowel to apply hydraulic cement to plug each hole.
First draw a plumb line to make sure the hat channels will be spaced properly for the size of drywall and insulation you re using.
The hat channel image 1 should be attached to the wall using concrete nails and concrete nail gun images 2 and 3.
Regardless you will simply be able to go through the process and you will have good results.
Countersink the screws making sure to only dimple the paper.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
You ll have a good wall that will look very nice overall.
Lay a piece of drywall board flat on the ground with the paper side down.
The process of hanging it is simple enough but it is kind of time consuming.
Drive three concrete nails spaced at even intervals through each side of each hat channel.
Then remove the tape.
Use concrete nails and a concrete nail gun to attach the hat channels to the wall after drawing a plumb line to make sure you ve spaced the hat channels properly for the size of drywall and insulation you re using.
Use a drywall saw to cut outlet markings outside the lines on drywall image 1.
And usually i was able to at least use strapping 3 4 plywood or furring bar.
Tape a one foot by one foot square of plastic sheeting plastic kitchen wrap will do to the concrete wall in your basement with duct tape and leave it in place for 24 hours.
Allow the cement to dry.
On a couple installs on the outside of elevator shafts etc we have installed drywall directly on the concrete using construction adhesive and minimal use.
Be careful not to break through the paper or this will compromise the structural integrity of the drywall.
If the basement walls are made of poured concrete check for rust spots at the metal ties.
If you want to find a drywall alternative that is going to be quick and easy then this isn t it.